top of page

We supply Waxed Cardboard Cones & Centralisers 

HOLDING- DOWN BOLT ALIGNMENT SYSTEM

Keep holding-down bolts aligned from pour to steel erection.

The Centraliser® System eliminates bolt movement during concrete pours, ensuring fast, accurate steel erection with zero rework.

CENTRALISER UNITS, WAXED CARDBOARD CONES AND PROJECT-SPECIFIC TECHNICAL SUPPORT SUPPLIED ACROSS THE UK.

engineer.png

35+ yrs civil engineering

england.png

UK-wide supply

group.png

On-site demonstrations

fast.png

Rapid dispatch on stock

technical-drawing.png

Project take-offs

Bolt Alignment — Done Right First Time

Centraliser® holds holding-down bolts securely in position during the concrete pour — preventing movement, maintaining alignment, and ensuring steel erection can proceed without delay or adjustment.

  • No bolt movement during pour

  • Accurate alignment within tolerance

  • No post-pour adjustments required

  • Ready for immediate steel installation

Results? Faster installation, reduced rework, and complete confidence on site.

THE PROBLEM

Misaligned bolts create problems long after the concrete has been poured.

Traditional bolt-box assemblies can allow waxed cones to move, distort or become damaged during installation and concreting. When bolts move away from their intended position, valuable baseplate tolerances may be consumed before steel erection begins

WITHOUT CENTRALISER
WITHOUT CENTRALISER
WITH CENTRALISER
WITH CENTRALISER

01

Bolts drift from their intended centre

04

Baseplates do not align cleanly

02

Cones lean, move or collapse

05

Bolts require adjustment or remedial work

03

Concrete and debris enter the bolt void

06

Steel erection is delayed

THE SOLUTION

A simple solution inside the
bolt box.

Centraliser is fitted around the holding-down bolt and positioned within the waxed cardboard cone. Its form helps locate the bolt centrally while providing internal support to the cone — creating a more stable bolt-box assembly before and during the concrete pour.

checked.png
checked.png
checked.png
checked.png

Locates the bolt centrally within the cone

Provides internal support to the waxed cardboard

Helps protect baseplate erection tolerances

Reduces avoidable on-site remedial work

THE BENEFITS

Better control at every stage of installation.

Centraliser is designed to help maintain bolt position, support cone stability and reduce avoidable remedial work — from foundation pour through to steel erection.

accuracy@3x.png

Accurate Bolt Positioning

Helps maintain the bolt in its intended location within the cone.

inflation.png

Reduced remedial work

Better initial positioning reduces the need for cutting or correction.

security.png

Protected tolerances

Helps preserve the movement allowance required during steel erection.

settings.png

Faster Steel Erection

Correctly positioned bolts make baseplate alignment more efficient.

ice-cream.png

Improved Cone Stability

Provides internal support and helps reduce distortion or crushing.

construction-site.png

Cleaner bolt voids

Can help reduce the risk of debris entering the cone opening.

THE PROCESS

From bolt-box assembly to steel erection

A four-stage workflow that integrates into existing site procedures.

01

Confirm the specification

Review cone dimensions, bolt diameter, embedment depth and baseplate requirements.

02

Assemble the bolt box

Fit Centraliser units to the bolt and position them within the waxed cone.

03

Install and pour

Secure to the setting-out system and complete the concrete pour.

04

Prepare for steel

Protect the bolt void until structural steel is erected.

THE PRODUCTS

Two related ranges. One controlled installation.

DSC_0114.JPG

CENTRALISER SYSTEM

Bolt Alignment Units

  • Suitable for a range of bolt and cone configurations

  • Standard and project-specific selection

  • Bespoke requirements considered

  • Technical support included

waxed-bolt-boxes.jpg

WAXED CARDBOARD CONES

Heights 229 – 762 mm

  • Designed for holding-down bolt-box applications

  • Wax coating provides moisture resistance

  • Multiple heights and diameters

  • Supplied separately or with Centraliser

PROJECT EVIDENCE

Used on structural steel-framed projects across the UK

From distribution centres to industrial units — Centraliser supports contractors on demanding programmes where bolt accuracy matters.

DISTRIBUTION CENTRE

Prologis Park Fradley

Lichfield, DC2

Centraliser Site Use

LOGISITICS HUB

Peddimore Unit B

Birmingham

Stoke-on-Trent.jpg

INDUSTRIAL STEEL FRAME

East Midlands Gateway

Plot 5

East Midlands Gateway Plot 8t .jpg

TESTIMONIALS

Proven through practical site use

quotation blue.png

I initially dismissed Centraliser as another gimmick, but after seeing the product demonstrated on site, I quickly changed my mind. The cones remained rigid during installation and the bolts stayed correctly aligned.

Mark Jackson

Hannon Brothers

quotation blue.png

A practical product that addresses a real on-site issue. The technical support during planning made specification straightforward and the units performed as described.

Site Engineer

Major UK Contractor

quotation blue.png

Reduced the need for bolt correction at steel erection stage and helped maintain programme. Will be specifying on the next phase.

Project Manager

Structural Steel Specialist

Centraliser Site Use_edited.jpg

PLAN YOUR NEXT PROJECT

Planning your next structural steel project?

Send us your bolt schedule, baseplate details, cone sizes or steel layout. We'll help identify the appropriate Centraliser units and quantities for your project.

07958 007153

UK-wide supply

GET IN TOUCH

DIRECT CONTACT

07958 007153

Mon - Fri

Project Enquiries

United Kingdom

UK - Wide Supply

WHAT TO INCLUDE

  • Bolt diameter and quantity

  • Cone dimensions

  • Number of bases

  • Embedment depth

  • Project drawings if available

YOUR DETAILS

Requirements Required

TECHNICAL DETAILS

ADDITIONAL DETAILS

Thanks for submitting! We will be in touch soon!

footer_3x.png

A holding-down bolt alignment system designed to keep bolts centred and cones stable from concrete pour to steel erection.

Supplied by Karra Construction Ltd.

PRODUCTS

SUPPORT

Site Demonstrations

Training

CONTACT

07958 007153

Mon - Fri

Project Enquiries

United Kingdom

UK-wide supply

© 2026 Karra Construction Ltd. Centraliser®. All rights reserved.

Privacy        Terms       Intellectual Property        Accessibility

CENTRALISER is Protected under Copyright, Designs and Patents Act 1988 for Intellectual Property with Approved Patent. Under no circumstances can it be manufactured, reproduced or replicated in any materials with intent to distribute or sell without the prior written consent from KARRA Construction Ltd. who is the Sole Inventor and Patent Holder Authorised to have manufactured and distribute CENTRALISER. Any infringement on the above Copyright for CENTRALISER will be liable for Prosecution Under Law.

bottom of page